Final Exam Hall Building, watercolour 5 x 7" cold press, April 2024 (No. 3743a)
Monday, April 29, 2024
Final Exam Hall Building
The final exam was on the downtown campus today at the Hall building, shown in the background of the painting. I showed up a bit early to find where all the rooms were, that can take anywhere from 10 minutes to an hour its so confusing but I managed to locate them all in short order across two different buildings. At any rate, there was a few minutes to make a quick painting standing on one corner looking across at the Hall building which has not changed much on the outside since its creation. Inside there is a hodgepodge of renovations done over the decades. Most recently they have been going floor by floor redoing the surfaces, plumbing, bathrooms, floors, and classrooms. Quite a few people were out and about, a few stressed out students no doubt. The painting composition makes use of a strong 2 point perspective, the sides of the square building receding off into the distance. They have an interesting metal sculpture too, it rotates inwards with the wind. Tomorrow I pick up the exams downtown and weather permitting I can squeeze in another painting.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment