Construction on Harley street, watercolour 5 x 7" cold press, June 2024 (No. 3797)
Friday, June 21, 2024
Construction on Harley street
On the usual walk to the Bakery to get my favorite loaf of bread and turkey sandwich for lunch, I was surprised by the complete lack of a sidewalk. A long line of construction vehicles were tearing it all up and redoing the water mains or something like that. At any rate, the Bakery was still accessible, you see it behind the trucks, and the opposite sidewalk was clear. To make the brick colour, I mixed yellow ochre with a touch of orange (PY43 + PO62), while the construction digger is deep yellow (PY110). I used straight red-orange (PO73) for the pylons.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment